
EN
Work Done
• Study of existing tank monitoring (Obsolete system and not operational).
• Preparation of electricals wiring diagrams UPDATED.
• Supply and replacement of all level sensor.
• Creation of signal table for each tank mA/Liters.
• Supply and installation of a PLC frame in wheelhouse.
• Supply and installation of a touch screen in wheelhouse.
• Rewiring of all the system.
• Test and commissioning.